FOR THE PERIOD 2012-2015
1. Rehabilitation of railway Stara Zagora – Turnov (to km 190 + 590) and Zavoi – Zimnitsa (from km.192 + 706 to incoming arrows of Zimnitsa) incl. Ch. tracks at S. Zagora and Yambol stations and all stations and stops between them with an approximate length of 120 km
Subject: Khan Asparuh – Nova Zagora
2. Construction of 35 automatic overlay devices under the program of NRIC
3. Electrification and modernization of the railway line Parvomai – Svilengrad Turkish / Greek borders of Bulgaria Transport corridor IV and IX
Sub-item: Parvomay – Dimitrovgrad railway station
4. Electrification and modernization of the railway line Parvomai – Svilengrad Turkish / Greek borders of Bulgaria Transport corridor IV and IX
Sub-item: Traction substation Dimitrovgrad
5. Electrification and modernization of the railway line Parvomay – Svilengrad Turkish / Greek borders of Bulgaria Transport corridor IV and IX
Sub-section: Main section station Yabalkovo
6. Reconstruction and drainage of the entrance gates of Asparuhovo station, Tarnak-Asparuhovo interurban railway station, Stuya railway station and Turnak station
7. Strengthening of the railway from km. 109 000 to km.117 000 in the Yunak – Velichkovo
8. Emergency construction of fortification facilities in the interurban Veliko Tarnovo – Debelets in the section from km.134 + 600 to km.135 + 100 on the 4th main railway station Rousse-Stara Zagora-Podkova
9. Rehabilitation of the railway sections Stara Zagora – Turn (from km 192 + 706 to the entrance point of Zimnitsa railway station), including the main tracks in Stara Zagora and Yambol stations and all stations and stops between them with approximate unfolding length (up to 190 + 590 in intermodal Yambol – Zavoi) and Zavoi – Zimnitsa of the 120 km track “with a total length of 21 km
10. Rehabilitation of the Mihailovo – Kaloyanovets railway sections, including the main tracks at Mihailovo and Kaloyanovets stations with an approximate length of the 121 km railway track
Sub-item: MRG Mihailovo station – reconstruction of the centralization and AB
FOR THE PERIOD 2015-2016.
11. Reconstruction and electrification of the railway line Plovdiv – Svilengrad, 11 Phase 4.2 – Reconstruction and electrification of railway section Harmanli – Svilengrad
12. Construction of high-speed contact network type RE -250 from Parvomay station to Dimitrovgrad station.
13. Construction of a new trolley depot – engineering for implementation of the project “Integrated 13 Urban Transport in Pleven” funded by OPRD 2007-2013 ”
part: Contact Network
FOR THE PERIOD 2017-2018.
14. The high-speed contact network of the site: “Modernization of the Pazardjik-Stamboliyski 14 railway line in the boundaries of the end of arrow №5 (km.119 + 624) along the road №1 and near arrow №1 (km.119 + 692) throat at Pazardjik station on the road 2 on the east throat of Stamboliyski station, including Ognyanovo and Stamboliyski stations
15. The Railway Infrastructure Repair Program of NRIC -Modernization of the railway infrastructure in order to increase the throughput by improving the parameters of the track and increasing the design speeds on the III-rd main railway line Sofia-Karlovo-Zimnitsa, interstage stage Klisura-Hr. Danovo from km 116-525 to km 130 + 009 with a total length of 13484m.
Part: Contact Network
16. Rehabilitation of the railway track, the artificial facilities, the facilities and the devices of the power supply system from the railway infrastructure in the station Stryama – station Klisura from km 107 + 200 to km 115 + 729 with a length of 8520 m “including Stryama and Klisura network
17. Repair of the railway infrastructure and its facilities in the Podvis-Prilep section from km 25 + 185 to km 29 + 595 with a length of 4 410 m on the 3rd railway line.
Part: Contact Network